Broad Street Culvert Replacement

Project Description: This project will involve two phases to replace an old and undersized culvert on the 400 block of Broad Street.  The first phase will be preliminary engineering; the second will be construction.

Project Background: An old and undersized culvert on Broad Street has been responsible for previous overtopping of the road.  This site has been included in previous Town flood studies by Sungate Engineering.

Status: Active/Funded. The Council approved funding for preliminary engineering in June with a budget modification in January. Sungate Design provided the lowest responsive bid, and will be providing preliminary engineering support. Preliminary engineering will be completed in FY 19/20, and construction bid in the summer of 2020.